Rectifiers, Zener, TVS and Schottky diodes; MOSFETs, BJTs and IGBTs from Vishay, onsemi, Diodes Inc, Littelfuse and ROHM — sourced in 4–6 weeks. One GST invoice.
Discretes go short in clusters. When one power MOSFET dries up, its cross-references usually dry up with it — same fabs, same demand cycle. The buyer who waited for the franchised channel to recover is the buyer whose kits sat incomplete.
We source diodes and transistors against your exact part number. Rectifiers, Zener, TVS and Schottky diodes; MOSFETs, BJTs and IGBTs — from Vishay, onsemi, Diodes Incorporated, Littelfuse and ROHM, through a Shenzhen-centred global network. 4–6 weeks standard, 7–10 days by emergency air cargo. Verified on receipt, one GST invoice.
Standard, fast-recovery and Schottky rectifiers for power supplies, chargers and converters. From Vishay, onsemi and Diodes Incorporated.
Voltage regulation and transient protection — Zener diodes and TVS arrays from Littelfuse, Vishay and onsemi. Small parts that block full board dispatch when missing.
Power and small-signal MOSFETs, including AEC-Q qualified variants where your BOM specifies them. Cross-references proposed only with your engineer's approval.
Bipolar transistors and IGBTs — discretes and modules — for motor drives, inverters, UPS and induction heating. From ROHM, onsemi and Vishay lines.
The usual advice for a short MOSFET is "use the cross." It works — until the shortage is demand-driven, and every part in the cross-reference table is short together. Power discretes move in cycles tied to the same end markets, and Indian order volumes don't move a global allocation queue.
We source through parallel channels — distributor overstock, brokers and agents across China, Hong Kong, Taiwan and Japan — typically in 4–6 weeks. Every shipment is verified on receipt and delivered with a complete import paper trail, manufacturer traceability where available.
If discretes are three lines on a longer shortage list, send the whole list. Our BOM fulfillment service quotes the standard lines and the blockers together — one shipment, one invoice.
Yes. Where your BOM specifies AEC-Q qualified parts, we quote against that exact part number — not the commercial-grade sibling. The qualification suffix is part of the requirement, and we treat it that way.
We propose cross-references with matching package, voltage, current and gate-charge characteristics, with datasheets attached. Your engineer approves before we procure — nothing is substituted silently.
Diodes and transistors are sourced through our global network in 4–6 weeks standard, or 7–10 days by emergency air cargo when a production line is waiting.
Yes. Every order ships with a GST invoice from a registered Indian company (GST: 06AAJCN3307P1Z5). We handle customs, duties and import documentation — you claim input tax credit as usual.
Send the part numbers or your full BOM. Pricing, availability and lead time within 48 hours — no commitment, no minimums.